lunduniversity.lu.se

Automatic Control

Faculty of Engineering, LTH

Denna sida på svenska This page in English

Projects

Practical Aspects

The projects are performed as team-work with the size of four persons per team (in special cases it is OK with smaller project teams). Constraints on hardware, processes, and supervisors require synchronization among the projects. If you are following the Predictive Control course it will be possible to do a joint project between the courses.

Important Dates

  • 2019-02-26: Presentation of available projects (Lecture 13)
  • 2019-03-XX: Deadline for team composition and project selection
  • 2019-03-XX: Deadline for the suggested solution document
  • 2019-05-XX: Deadline for the project report
  • 2019-05-27: Project demos and oral presentations (mandatory)

Project Groups

  • Project XX: Title
    • Advisor: XX
    • Equipment: XX
    • Status Project: OK | NO
    • Status Report: OK | NO
    • Status Presentation: OK | NO
    • Participants: Student (E-mail), Student (E-mail), Student (E-mail), Student (E-mail)
Page Manager: